Analysis tools for ground-related structures and improvement.

Retaining wall

Foundation

Tunnels

Ground improvement

Slope stability

Tools on this page

Gravity retaining wall stability to EN 1997-1
Sliding, overturning and bearing checks of a gravity wall, with or without a rubble base. Method: Coulomb earth pressure; EN 1997-1 DA1 (or factors of safety) for sliding, overturning about the toe and bearing (Annex D) with eccentricity.
Shallow footing bearing capacity – EC7 Annex D, Vesić, Hansen, Meyerhof, Terzaghi
Bearing resistance, sliding and eccentricity of pad and strip footings, drained or undrained. Method: Bearing capacity factors with shape, depth and inclination factors (EN 1997-1 Annex D, Vesić, Hansen, Meyerhof or Terzaghi, after Bowles); effective width B′ = B − 2e; EC7 DA1 or factor of safety.
Pile axial capacity and settlement – single pile and pile group
Shaft and base resistance in compression and tension, negative skin friction, group efficiency and settlement. Method: SPT-N correlations or α / β and Nc / Nq; EN 1997-1 DA1 with model factor; drag load from negative skin friction; Converse–Labarre group efficiency; settlement by Vesić (1977).
Beam on elastic (Winkler) foundation
Deflection, bending moment, shear and soil pressure of a beam or strip footing on a Winkler foundation. Method: Euler–Bernoulli beam elements with a consistent Winkler foundation stiffness k = ks·B; optional tensionless foundation solved iteratively.
Embedded retaining wall – cantilever and propped walls
Required embedment, bending moment, shear and strut forces of sheet pile, contiguous pile and diaphragm walls. Method: Cantilever: fixed earth support (simplified Blum, design embedment 1.2·d0). Single prop: free earth support about the prop, with construction stages. Earth pressure EN 1997-1 Annex C, as the ERSS toe-stability check.
ERSS stability – toe stability, base heave, piping and uplift
Stability checks of an excavation between embedded walls. Method: Toe stability: moments about the lowest strut with EN 1997-1 Annex C coefficients. Base heave: Terzaghi with an embedded toe. Hydraulic heave and uplift: EN 1997-1 HYD and UPL on a Terzaghi prism. DCM and bored piles optional.
Soil nail wall – BS 8006-2 and FHWA GEC 7
Global stability with nails, sliding and facing head load of a soil nail wall. Method: Bishop's simplified method on circular slip surfaces with nail forces T = min(tension, pull-out behind, facing + pull-out in front). BS 8006-2 with EN 1997-1 DA1-C2 partial factors, or FHWA GEC 7 (FHWA-NHI-14-007) allowable stress design.
Reinforced soil wall – geosynthetic, BS 8006-1
External and internal stability of a geosynthetic reinforced soil wall. Method: BS 8006-1:2010+A1:2016 tie-back wedge method; sliding, bearing and eccentricity; rupture and pull-out of each layer with combinations A, B and C.
Consolidation settlement and PVD design
Primary consolidation settlement against time of a layered profile, with prefabricated vertical drains and reclamation fill. Method: One-dimensional consolidation (Cc, Cr, OCR) solved by finite differences in time; radial drainage to PVDs by Hansbo (1981) with smear and well resistance.
Stone columns – Priebe settlement improvement
Settlement with and without stone columns on a triangular or rectangular grid, bulging capacity and consolidation time. Method: Priebe (1995): basic improvement factor n0, column compressibility, depth factor fd and compatibility limits, sublayers of 0.5 m; bulging by Hughes & Withers (1974); consolidation by Hansbo with Han & Ye (2001).
Sand compaction pile – settlement and strength
Settlement reduction, rate of consolidation and composite strength of SCP-improved clay. Method: Japanese design method (OCDI; Aboshi et al. 1979): stress concentration ratio, settlement reduction β = μc, Hansbo radial drainage, composite shear strength.
Deep soil mixing columns
Settlement, column stress and capacity of DSM columns. Method: Equal-strain stress sharing and composite modulus; column material strength from qu with a field/lab factor; geotechnical capacity after Broms (1999).
Slope stability – Bishop simplified
Critical circular slip surface and factor of safety of a layered slope. Method: Bishop's simplified method on circular slip surfaces with an automatic grid search; drained or undrained layers; factor of safety or EN 1997-1 DA1-C2.
Cut-and-cover box tunnel
Bending moments and forces in a single-cell box under earth and water pressure. Method: Closed frame on the member centrelines on Winkler springs or a uniform base pressure; load cases with at-rest and active pressure; ULS and SLS.
Bored tunnel segmental lining
Thrust and bending moment in a segmental tunnel lining. Method: Bedded-beam (spring) model of the ring with compression-only radial springs (ITA / Duddeck); Muir Wood joint reduction.
Mined tunnel – convergence–confinement
Ground reaction curve, support characteristic and equilibrium of a circular tunnel. Method: Convergence–confinement method: Mohr–Coulomb ground reaction (Duncan Fama 1993), longitudinal profile (Vlachopoulos & Diederichs 2009), shotcrete and bolt support curves.